First inflation of our latest rubber dam installed across the Rio Caia near Arronches in Portugal. The 24.0m wide, 1.8m high air-inflated rubber dam took four days to install. It…
This week, we are back in Europe installing a new rubber dam across the Rio Caia near Arronches in Portugal. The 24.0m wide, 1.8m high rubber dam is inflated by…
This week we are in Slovenia replacing the rubber membrane for a water-filled rubber dam at MHE Hrušica near Jesenica. The original rubber dam was manufactured and installed by a…
We are on site in the USA this week commissioning two rubber dams for the Lock and Dam 14 small hydroelectric project on the Kentucky river near Heidelberg. The 10ft…
The work to replace two rubber dams on the River Menturus in Indonesia is now complete. Thanks to the local contractor, PT. Parama Adhi Pratama, for carrying out the work.…
One of our latest projects is to replace two ageing rubber dams installed on the River Menturus near Surabaya in Indonesia. Both rubber dams have a design height of 2.1m…
This week is the 20-year anniversary of Dyrhoff Ltd. We start our third decade with the same level of enthusiasm and excitement we had back in 2005. Many thanks to…
Dyrhoff is pleased to announce our participation in the Dams and Hydropower Türkiye Summit, which will be held on 3rd and 4th December 2024 at the Divan Hotel in Ankara.…
Dyrhoff is excited to be attending the BHA Annual Conference 2024, set to take place at the Hilton Glasgow on 26th and 27th November 2024. We look forward to engaging…